Projects Portfolio

HWA Project Profiles

Demonstrated Expertise to Ensure Successful Project Completion

PUBLIC PROJECTS

Summit Drive ADA Improvement Project

  • Surveying
  • Design
  • Construction Management
  • Inspection Services

This City of Bend project consisted of replacing 92 ADA ramps and associated sidewalk on Summit Drive over Awbrey Butte. The road grades in this area are as steep as 9%.  HWA provided surveying, design, construction management, and inspection services for the City of Bend. The new compliant curb ramps and landings, which meet PROWAG regulations, required creative solutions for working in and around existing facilities, including walls, fences, utility poles, structures, and existing landscaping.

Summit Drive ADA Project Bend Oregon

Location: Bend, Oregon

North 3rd Street Pedestrian Connectivity Road Engineering Project Bend Oregon

Location: Bend, Oregon

ODOT North 3rd Street Pedestrian Connectivity Project

  • Project Management
  • Surveying
  • Engineering
  • Construction Document Preparation

HWA worked closely with the City of Bend to successfully deliver this ODOT administered project. The project goals were to provide pedestrian connectivity and ADA complaint facilities along this busy major arterial. HWA provided the project management, surveying, engineering, and construction document preparation services necessary for the replacement and/or installation of approximately 1100-feet of sidewalk and associated ADA facilities.  Design work for this project was completed within the budget and a tight schedule driven by the grant funding requirements. HWA was also responsible for the CE/CA of the project during the fall of 2011.

South Third Street Pedestrian Improvement Project

  • Topography  Survey
  • ADA Ramp Designs
  • Construction Plans, Specifications, Cost Estimates

HWA was teamed with OBEC and Lancaster Engineering to provide survey and design services for this City of Bend project to enhance pedestrian and bicycle safety on this 2.4-mile section of busy major arterial roadway. This project was administered through ODOT due to the funding source. The project construction was recently completed. HWA has provided a detailed topographic survey of the entire corridor, prepared detailed ADA ramp designs, and construction plans, specifications, and cost estimates. Due to the retro-fit nature of the project, creative designs have been required to provide safe, compliant facilities within the existing development and Right-of-Way constraints.

South Third Street Pedestrian Improvement Project Bend Oregon

Location: Bend, Oregon

Location: Bend, Oregon

Phase 2 ADA Improvement Project

  • Surveying
  • Design
  • Construction Management

In June of 2010, HWA completed the construction plans and specifications for the Downtown District, Downtown Core, and Bus Route & Overly bid packages. These three separate construction contracts were completed in the fall of 2010. HWA provided surveying, design, and construction management services to the City of Bend. In total, the project included the reconstruction of approximately 180 curb ramps. The ADA requirements for location of the new compliant curb ramps and landings required creative solutions for working in and around existing facilities, including walls, fences, utility poles, structures, and pedestrian crosswalk amenities.

General Obligation Bond Transportation Improvements

  • Engineering Construction Documents Preparation
  • Topography Surveys
  • Boundary Resolutions
  • Legal Exhibits

HWA was a key member of a team assembled to deliver this $30 million City of Bend roadway improvement project along Reed Market Road.  HWA was responsible for preparing the engineering construction documents for the Reed Market Road stretch bordered by the railroad crossing to the west, and Newberry Drive to the east, and included the 15th Street roundabout. In addition, HWA also prepared topographic surveys, boundary resolutions, and legal exhibits for the entire project corridor.

Utility infrastructure improvements included 8-inch gravity sewer mains with external drop manhole design, 8-inch and 15-inch gravity storm sewer mains, a 16-inch water main extension, and franchise utilities in an area with significant existing constraints.

The transition of the Reed Market Road and 15th Street intersection to a completed roundabout required creative design elements around established existing obstacles and utilities, conscientious traffic control phasing, area business and public relations, and thorough utility coordination in order to ensure a smooth construction process with limited interruptions.

General Obligation Bond Transportation Improvements Bend Oregon

Location: Bend, Oregon

Location: Bend, Oregon

Galveston Avenue Bicycle/Pedestrian Improvements

  • Topography Surveying and Mapping
  • Design
  • Engineering
  • Construction Management

HWA provided surveying, engineering and construction management services to help the City of Bend complete a half-mile long pedestrian, bicycle, and traffic calming project on Galveston Avenue between 14th Street and Lindsey Court. The project added sidewalks, twenty-two ADA curb ramps, and bike lanes to a busy section of roadway through an established neighborhood. The project included traffic calming measures such as varying roadway widths, landscaping, raised medians, striping, a curvilinear alignment, and on street parking.  HWA provided topographic surveying and mapping, designed the improvements, prepared construction drawings, resolved right-of-way boundaries in the corridor, and provided construction management services.

5th and 6th Street Improvements

  • Construction Documents, Specifications, Cost Estimates
  • Curb Ramp Grading Details
  • Engineering Services

In 2009, HWA designed and prepared construction documents for the City of Redmond’s 5th Street Improvement Project that replaced roadway, sidewalks, intersections, eighty-eight (88) curb ramps, drainage facilities, a water main, and water meters along 15 blocks within the historic downtown district. HWA completed the project on an accelerated schedule – going from 15% design to 95% design in just five weeks. The rapid schedule was necessary to ensure that Redmond would qualify to receive ARRA funding for the project. The project was prepared using ODOT standards. HWA prepared construction plans, specifications, cost estimates, and curb ramp grading details. HWA also served as a sub consultant to W&H Pacific during the CE/CA phase of the project to provide engineering services, answer construction questions, respond to RFI’s and assist with other tasks as needed. Construction was completed in July of 2010.

Following completion of 5th Street, HWA began preparation of design and construction documents for 6th Street. The project is similar in scope to 5th Street and replaces curb, sidewalk, seventy-six ADA ramps, eleven intersections, pavement, and bike lanes for approximately 1 mile of arterial roadway through Redmond’s business district. This section is currently under construction, and HWA is providing supplemental CE/CA services to ODOT.

Location: Redmond, Oregon

Newport and 14th Street Roundabout Bend Oregon

Location: Bend, Oregon

Newport and 14th Street Roundabout

  • Conceptual Design
  • Construction Drawings

HWA prepared design drawings from conceptual design through construction drawings for this 120′ diameter roundabout between two minor arterial streets. Services included design coordination with City of Bend engineering personnel, utility re-location design and coordination, and roundabout road design to minimize right-of-way acquisition requirements while meeting required design standards. Mark Douglas was the project engineer/manager for HWA.

NW Maple Avenue Corridor Improvements

  • Engineering Services

HWA engineered 4,800 lineal feet of major arterial street improvements that connected NW 19th Street to Highway 97 via the Maple Avenue Bridge. Design teamwork with City officials, the bridge engineer, and the traffic engineer, resulted in a collaborative effort that created a designed product for the northern transportation connection across the dry canyon in Redmond. 

Key elements included intersection design with Highway 97, utility relocations, bridge and approach design coordination, and right-of-way legal descriptions.

 

NW Maple Avenue Corridor Improvements Redmond Oregon

Location: Redmond, Oregon

SE Interceptor Phase 1 Extension Bend Oregon

Location: Bend, Oregon

SE Interceptor Phase1 Extension

  • Topography Surveying
  • Easement Preparations
  • Engineering Services
  • Project Management

HWA was the team lead for this City of Bend sewer main extension project, providing an important link for the City’s overall Southeast Interceptor sewer transmission main project for additional required capacity as the City continues to grow.  The project included the design of over 6,800 feet of 8-inch through 24-inch sewer mains within existing roadways in an area with high traffic use, and adjacent to St. Charles Hospital and Bend Memorial Clinic.  HWA’s survey staff provided a full topographic survey of the project, including boundary resolutions, and easement preparations at critical locations along the sewer alignment.

As the lead engineering and project management firm, HWA provided extensive engineering designs of the sewer infrastructure and associated improvements through road corridors with many existing major utilities.   HWA has managed the project overall over a team that includes staff from five different firms and delivered the complete Plans, Specifications, and Estimate (PS&E) package on time and well under budget.  Construction was completed in early February, 2018.

Private Projects

St. Charles Expansion and Offsite Storm Sewer and Water Main

  • Design
  • Stormwater Management Solutions

This expansion project included the design of accessible site, parking and emergency vehicle circulation elements for this important and central hospital facility in Madras.  In an area with very poor drainage, creative storm water management solutions were incorporated in order to maintain the historical runoff flows while capturing the drainage from the significant increase in hardscape and roof areas.  Solutions included underground chambers for runoff storage, and a weir vault to limit the outfall to the City storm sewer system. 

Along with the on-site development, this project included the design and construction of over 1,200 feet of off-site 18” storm sewer and associated lateral piping, manholes, and catch basins within existing streets.  As part of this project, HWA also completed the design of over 800 feet of 10-inch and 12-inch water main within ‘A’ Street along with associated fire service laterals, hydrants, and pressure reducing valves, completing a tie-in to the DVWD system for the hospital’s fire service.

 

St. Charles Expansion and Offsite Storm Sewer and Water Main Madras Oregon

Location: Madras, Oregon

Location: Bend, Oregon

Franklin Crossing Building

  • Site Improvements Design

HWA was responsible for the design of all site improvements associated with the five-story, 130,000 square foot mixed-use building with underground parking at the intersection of two arterial streets in downtown Bend. 

This project required extensive relocation of existing utilities, arterial street improvements, and ADA compliance upgrades.

 

Big Sky Village

  • Project Engineer

HWA has been the Project Engineer for this 36-lot single family residential subdivision on SE 27th Street. The project consisted of preparing a topographic and boundary survey of the site, creating the land use documents, the construction documents, and construction administration and staking. The design team worked closely with developer and the home builder to create lot layouts that worked with the home product that was desired. This project included extensive site grading, filling of existing ponds, piping of COID irrigation canals, and Avion water system needs including the crossing of the recently paved 27th Street.

Big Sky Village Bend Oregon

Location: Bend, Oregon

Purcell Landing Bend Oregon

Location: Bend, Oregon

Purcell Landing

  • Project Engineer

HWA has been the Project Engineer for this 83 lot residential townhome subdivision on NE Purcell Boulevard. The project consisted of preparing a topographic and boundary survey of the site, creating the land use documents, the construction documents, and construction administration and staking. The design team worked closely with River’s Edge Development and the home builder to create lot layouts that worked with the home product that was desired. This project included extensive site grading, retaining walls, private alleys, and drainage considerations due to the existing site topography.

 

Park Projects

Canal Row Park

  • Topography Survey

HWA worked with Bend Park & Recreation District to prepare City of Bend public improvement plans for the work within the Butler Market Road right-of-way that was required for this project. This included preparing a topographic survey of the site, street widening and adding a curb, a meandering sidewalk, fire hydrant, and ADA curb ramps.

Canal Row Park Bend Oregon

Location: Bend, Oregon

Millers Landing Park Bend Oregon

Location: Bend, Oregon

Miller's Landing Park

  • On-Site Plans
  • Infrastruction Plans

HWA prepared private on-site plans and public City of Bend infrastructure plans for this new Bend Park & Recreation District park along the Deschutes River. The public improvements consisted of the reconstruction of half of Riverside Boulevard with curb, sidewalk, utility services, ADA curb ramps, and drainage controls via storm runoff ponds, and the construction of the adjacent alley. 

The private on-site plans consisted of erosion control plans, site and grading plans for walks, trails, and the parking lot, and site details and specifications.

Larkspur Bend Senior Center

  • Surveying
  • Civil Design

HWA was on the design team to provide the surveying and civil design for this major addition and associated site improvements. The design included public work on SE 15th St, including sidewalk widening and a retention pond expansion. The on-site work consisted of the design of a large parking lot expansion, drainage system design, piping an irrigation canal, sewer and water relocation work to provide new hydrants and building services that do not conflict with the new building expansion.

Larkspur bend Senior Center Bend Oregon

Location: Bend, Oregon

Construction Management Projects

Amethyst/Mahogany Diversion Project

  • Construction Management
  • Inspection Services

HWA provided construction management and inspection services for the City of Bend on this sewer main diversion project at the south end of town. The 2019 project included the construction of approximately 1,200 linear feet of new sewer mains and associated right-of-way improvements within South 3rd Street and Murphy Road to support the Amethyst and Mahogany street neighborhoods. HWA staff provided construction document reviews, and inspection support services to assist with the City’s limited inspection resources. HWA’s duties included providing daily inspection services with progress reporting and photographs, contractor submittal reviews, quantity measurements and field verification, quality assurance and field inspection reports, holding weekly construction schedule and progress meetings, coordination and notification with local business owners and residents, change order processing, material sampling and testing coordination, traffic control, and final walk through, punch lists, and project closeout services. Construction management services were coordinated through the City’s EADOC system with daily uploads for City review and records administration.

Amethyst Mahogany Diversion Project in Bend Oregon

Location: Bend, Oregon

Location: Bend, Oregon

Murphy Road Extension Project

  • Construction Management
  • Document Reviews
  • Inspection Services

HWA is providing support construction management and inspection services for the City of Bend as a part of a larger team on this $32 million, 5-year Transportation Capital Improvement Project extending Murphy Road from its existing terminus at Brosterhous Road to 15th Street. Along with the roadway extension and right-of-way improvements, the project includes three separate roundabouts as well as a bridge crossing over the BNSF railroad.

HWA staff is providing full construction document reviews, inspection support, and construction management services to assist the multi-disciplinary management team and City of Bend staff. HWA’s duties include providing daily inspection services with progress reporting and photographs, contractor submittal reviews, quantity measurements and field verification, quality assurance, attending weekly construction schedule and progress meetings, coordination and notification with local business owners and residents, change order processing, coordinating material sampling and testing coordination in accordance with ODOT’s Quality Assurance Program requirements, traffic control, and final walk through, punch lists, and closeout services for each segment phase. Construction management services are coordinated through the City’s EADOC system with daily uploads for City review and records administration.

Summit Drive ADA Improvement Project

  • Construction Management
  • Inspection Services

HWA provided the full construction management and inspection services for the City of Bend on this pedestrian ADA improvement project along Summit Drive, over Awbrey Butte. This project, completed in 2015, was selected as part of the Department of Justice (DOJ) settlement agreement to ensure that City-wide routes are made accessible to all citizens. The project consisted of replacing 92 non-compliant curb ramps and associated sidewalks with ramps and walks conforming to ADA and PROWAG standards along road grades as steep as 9-percent. HWA’s duties included providing daily inspection services with progress reporting, quantity measurements and field verification, quality assurance and field inspection reports, holding weekly construction schedule and progress meetings, change order processing, material sampling and testing coordination, traffic control, pay notes and City payment coordination, and project closeout services. Construction management services were coordinated through the City’s EADOC system with daily uploads for City review and records administration.

Location: Bend, Oregon

The recognized Engineering and Surveying leader in Central Oregon